At AQ Construction Corp, we specialize in the swift and efficient removal of building violations from all major New York City agencies. Whether you're facing a DOB stop-work order, a DOT sidewalk violation, a DEP environmental notice or an ECB hearing, our licensed team has the expertise to resolve your violations quickly and get your project back on track. Serving Brooklyn, Bronx, Queens, Manhattan, Nassau County, Westchester and Yonkers, we've successfully cleared thousands of violations for property owners across the region.
New York City Department of Buildings violations can halt construction, delay projects and result in substantial fines. At AQ Construction Corp, we handle all types of DOB violations with speed and precision, ensuring your property remains compliant with NYC building codes.
Class 2 violations are hazardous conditions that must be corrected within 90 days, while Class 3 violations are non-hazardous conditions requiring correction within 90 days. At AQ Construction, we handle the complete remediation process across both categories. This process can include obtaining retroactive permits for unpermitted work, filing applications for variances or amendments, coordinating inspections and ensuring that all documentation is properly submitted to clear violations from your property record.
Average Timeline: 2-8 weeks depending on violation severity and complexity

NYC Department of Transportation violations typically involve sidewalks, curbs, roadways and street conditions adjacent to your property. As a property owner, you're responsible for maintaining safe pedestrian access, and DOT violations can result in significant fines and legal liability.
Sidewalk defects are one of the most common DOT violations in New York City. Property owners are responsible for maintaining sidewalks adjacent to their buildings in safe condition. Violations are issued for cracked concrete, uneven surfaces exceeding 1/2 inch vertical displacement, broken pavement, trip hazards and deteriorated conditions.
DOT sidewalk violations must be corrected within 75 days of issuance. If not corrected, DOT may perform the work and bill the property owner at substantially higher costs, often 2-3 times what a private contractor would charge. Additionally, unrepaired sidewalk violations can create legal liability if someone is injured.
Fortunately, AQ Construction is here to help you prevent and rectify any of these violation issues you might face as a local homeowner.
Average Timeline: 2-8 weeks depending on violation severity and complexity
NYC Department of Environmental Protection violations involve water supply, sewage systems, air quality and environmental compliance issues. DEP violations can be complex, requiring specialized knowledge of plumbing codes, environmental regulations and backflow prevention requirements.
In particular, backflow prevention device violations are among the most common DEP citations. NYC requires backflow preventers on water service lines to protect the public water supply from contamination. Violations can be issued for missing devices, failed annual testing, expired certifications or non-compliant installations.
If you find yourself facing any of these situations as a property owner, AQ Construction has the solution. We are happy to install DOB-approved backflow prevention assemblies, coordinate required testing with certified testers, file all necessary paperwork with DEP/DOB and ensure ongoing compliance with annual testing requirements.
Average Timeline: 4-10 weeks depending on complexity and permit requirements
The Environmental Control Board adjudicates violations from multiple city agencies including DOB, DOT, DEP, FDNY, and DOHMH. ECB violations involve hearings, potential fines and strict deadlines. Fines can range from $250 to $25,000 or more, depending on the violation type and severity. Swift remediation is critical to minimizing penalties and demonstrating good faith compliance efforts.
Pre-Hearing Compliance Work
The most effective way to minimize ECB fines is to correct the underlying violation before your hearing date. We work quickly to remediate the issue that triggered the violation, obtain all necessary permits and certifications, complete required repairs or installations, and compile comprehensive documentation proving compliance.
When you or your legal representative appear at the ECB hearing with proof that the violation has been corrected, judges typically impose significantly reduced fines or dismiss penalties entirely. Our documentation package includes photos, permits, inspection certificates and contractor certifications — everything needed to demonstrate compliance.
Post-Hearing Compliance
If you've already had your ECB hearing and received a compliance order with specific deadlines, we can complete all required work within the timeframes mandated by the judge. We ensure all conditions are met, properly documented and submitted to avoid additional penalties or default judgments.
Important Note: AQ Construction Corp performs the physical remediation work to correct violations. We do not provide legal representation at ECB hearings. We recommend consulting with an attorney who specializes in ECB matters for hearing representation while we handle all the compliance work.


At AQ Construction Corp, we've developed a streamlined approach to violation remediation that minimizes your time, stress and costs. Here's exactly what you can expect when you work with us:
Contact us with your violation notice, and we'll conduct a thorough assessment within 24-48 hours. We review the specific violation codes, inspect your property if needed and determine the exact requirements for compliance. You'll receive a detailed explanation of the violation, potential risks of non-compliance and our recommended approach.
We develop a tailored action plan that includes the scope of work required, timeline for each phase, estimated costs with transparent pricing, permit and filing requirements, and expected outcomes. Our team handles all paperwork, applications and communication with NYC agencies. You'll also know exactly what to expect before we begin any work.
Our licensed contractors perform all necessary repairs, installations or modifications to bring your property into full compliance. All work is performed to current NYC building codes, we use quality materials and proven methods, work is completed efficiently to meet deadlines and we maintain clean, safe work sites.
Average Total Timeline: Most violations are cleared within 2-8 weeks, though complex cases may take longer.
Please reach out to us if you cannot find an answer to your question.
A Class 1 violation is the most serious type of Department of Buildings violation, indicating an immediately hazardous condition that poses a direct threat to public safety. Examples include structural defects that could cause collapse, fire safety issues like blocked exits or non-functioning sprinkler systems, elevator malfunctions and hazardous electrical or gas conditions.
Class 1 violations must be corrected within 24 hours to 30 days depending on the specific violation type. Failure to address Class 1 violations can result in stop-work orders, building vacate orders and fines up to $10,000 or more.
The timeline for correcting a violation depends on the type and issuing agency. DOB Class 1 violations must be corrected within 24 hours to 30 days, Class 2 and Class 3 violations within 90 days. DOT sidewalk violations must be corrected within 75 days. DEP violations typically allow 30-90 days depending on the issue. ECB violations require correction before your hearing date or within timeframes set by the administrative law judge.
Yes, unresolved violations can significantly impact property sales. Most title companies require all violations to be cleared before closing, and mortgage lenders may refuse to finance properties with open violations. Even if a sale proceeds, violations typically reduce property value and can become negotiating points that cost you money. If you're planning to sell your property, contact us for a violation clearance consultation to ensure a smooth transaction.
For most DOB, DOT and DEP violations, yes — you must use a licensed contractor. NYC requires that work to correct building violations be performed by properly licensed and insured contractors with appropriate trade licenses. Additionally, a licensed contractor must pull permits and file all necessary paperwork with the relevant agencies. AQ Construction Corp is fully licensed in NYC, Nassau County, Westcheser County and Yonkers with all required trade licenses and insurance coverage.
Violation removal costs vary widely depending on the type of violation, scope of work required, permit and filing fees, inspection costs and any associated fines or penalties. Due to these factors, we provide free assessments and detailed cost estimates before beginning any work.
AQ Construction Corp. General Contractor offers a wide range of residential construction services in New York City - Brooklyn, Bronx, Queens, Manhattan - Nassau County, Westchester County and Yonkers
AQ Construction Corp General Contractor
974 Sacket Ave., Bronx, NY 10462 | LICENSES NYC HIC: 1453522 WC: 25675-H13 YONKERS: 5448 NASSAU: 183961
Copyright © 2024-2026 AQ Construction Corp. General Contractor - All Rights Reserved. Powered by Hooked Up Media

If you have questions or need an estimate we'd be happy to talk to you.